DED Licensed

InterNACHI Certified

RERA Approved

Plastering & Drylining Inspection Services in Dubai

A fire-rated board installed the wrong way isn't a fire-rated wall. We verify plastering and drywall partitions against Dubai Civil Defence fire ratings and moisture-resistance requirements — not just how they look.

15,000+

Inspections Completed

1 Yr

Check Interval

24–48h

Report Delivery

4.9 ★

Google Rating

Why It's Essential

Poor Plastering & Drylining Is the Top Post-Handover Complaint in Dubai

Hidden defects behind a smooth-looking wall can lead to cracks, mould, poor fixings, and — in commercial buildings — a wall that fails its fire rating despite using the right board.

The Standard We Inspect Against

Dubai Civil Defence requires partition walls to meet specific fire-resistance ratings — typically 60 minutes for standard separating walls, and 90–120 minutes for stairwells, lift lobbies, and plant rooms. Critically, the rating applies to the entire tested assembly — board type, stud gauge, fixing pattern, and joint sealing together — not the board alone.

In wet areas, moisture-resistant (green-faced) board is required given Dubai’s 90%+ coastal humidity. Using standard board here leads to swelling, joint failure, and mould — even when everything looks fine on the surface.

What We Inspect

What We Check, Point By Point

Wall & Ceiling Alignment

Straightness and flatness checked to prevent cracks, uneven finishes, and long-term surface issues.

Surface Finish Quality

Smoothness, texture, and finishing quality assessed and documented for timely correction.

Cracks & Joint Fixing

Weak joints and poor fixing points identified before they become costly repairs.

Plaster Thickness

Correct application checked for strength, durability, and long-lasting performance.

Drywall Installation Quality

Panel fixing, joint alignment, and secure installation checked to prevent sagging or warping.

Moisture & Insulation Check

Damage, water ingress, and insulation gaps checked to prevent mould and energy loss.

Our Process

How We Inspect Plastering & Drylining

01

Visual & Technical Inspection

Walls, ceilings, and finishes checked for alignment, smoothness, and structural integrity, with all findings recorded.

02

Fire & Moisture Verification

Partition assemblies checked against Dubai Civil Defence fire ratings and moisture-resistance requirements for the room type.

03

Detailed Inspection Report

Photo evidence of every defect, with clear, professional recommendations you can act on immediately.

Who This Is For

Who Needs a Plastering & Drylining Inspection

Property Owners & Landlords

Protect your investment by catching hidden defects before they escalate.

Real Estate Investors

Evaluate true finishing quality before committing capital to a property.

Developers & Contractors

Verify workmanship and compliance before authority sign-off.

Tenants Preparing for Handover

Document existing condition and flag issues before you take possession.

Renovation & Fit-Out Projects

Confirm new partition and finish work meets fire and quality standards.

Our Process

How We Inspect Plastering & Drylining

Early Defect Detection

Concealed cracks, poor adhesion, and moisture damage caught before they get out of control.

Fire & Compliance Verified

Checked against Civil Defence fire ratings and Dubai Municipality construction standards.

Clear, Actionable Reporting

Photo evidence and specific recommendations, not vague observations.

Unbiased & Independent

Zero commercial ties to any contractor — our results have no conflict of interest.

Protects Long-Term Value

Preserves finish quality and durability, avoiding costly structural repairs later.

Peace of Mind

A detailed, actionable report you and other stakeholders can rely on with confidence.

Client Reviews

What Clients Say After Their Inspection

4.9
★★★★★
Based on 31 Google reviews for external work & facade inspections
FA
Fatima Al Zaabi
1 month ago
★★★★★

Great communication throughout. They inspected our tower's facade cladding and delivered the compliance report ahead of schedule.

Posted on Google
JM
James Miller
2 weeks ago
★★★★★

Booked them for a pre-purchase facade survey on an apartment in Marina. Clear report, fair price, and quick turnaround.

Posted on Google
MR
Mohammed Al Rashidi
5 weeks ago
★★★★★

Excellent service from start to finish. They caught cracking in the parapet wall the contractor had missed completely.

Posted on Google
SK
Sara Khan
3 weeks ago
★★★★★

Professional, punctual, and thorough. The report gave us exactly the leverage we needed with the developer.

Posted on Google

FAQ

Common Questions

A professional check of walls, ceilings, and drywall finishes. It verifies proper installation, alignment, and quality — including fire-rating and moisture-resistance compliance — while identifying issues like cracks, poor adhesion, and moisture problems early.

Dubai Civil Defence mandates specific fire ratings for partition walls, and coastal humidity above 90% makes moisture-resistant board essential in wet areas. Poor plastering and drylining is one of the most frequent post-handover complaints in the city.

Property owners, landlords, investors, developers, contractors, and tenants preparing for handover — especially before final payment, handover, or renovation sign-off.

Most apartments take 1–2 hours; larger villas or commercial fit-outs with multiple partition types can take longer.

A detailed report with photo evidence of every defect, severity ratings, and clear, professional recommendations for correction.

Start Today

Is Your Partition Wall Actually Fire-Rated?

Book an independent plastering & drylining inspection before handover, payment, or Civil Defence submission.