Professional Snagging Report
A photo report of every defect before you sign.
Snagging report in DubaiIndependent handover, DLP and resale snagging for apartments and villas. 400+ checkpoints and a photo report in 24 hours, so the developer fixes every defect before you sign.
Dubshy is a RERA and InterNACHI certified property snagging and inspection company based in Dubai. For over 5 years our engineers have helped buyers and investors find hidden defects before they become their problem.
We work only for property owners, never for developers, so every report is written in your interest.
Our engineers check every system in your home across 400+ points, from structure to finishing.
A photo report of every defect before you sign.
Snagging report in DubaiWalls, ceilings and cracks checked by a civil engineer.
Civil inspection services DubaiSockets, switches, breakers and wiring safety tested.
Electrical systems inspection in DubaiLeaks, water pressure and drainage checked.
Plumbing inspection DubaiCooling, airflow and thermal camera checks.
AC inspection services DubaiTiling, fittings, drainage and cabinet alignment.
Bathroom and kitchen inspection in DubaiTiles, marble and wood checked for cracks and gaps.
Floors and coverings inspection in DubaiFrames, seals, locks and finish quality.
Windows and doors inspection DubaiLooking for something else? We also inspect level tolerances, ventilation, plastering, carpentry, painting, external works and gardens.
Clear starting prices by property type. No hidden fees, and the same thorough inspection every time.
Apartments
Apartments
All sizes
Offices, retail, full buildings
Want the full breakdown? Read our guide to property snagging cost in Dubai.
We work for you, not the developer. Our independent inspections give you the evidence to get every defect fixed before you move in.
We never work for developers, so every report is written only in your interest.
Every inspection is carried out by a certified engineer, not a general handyman.
Structure, MEP, AC and finishes checked room by room, not a quick walkthrough.
Thermal cameras and moisture meters find leaks and damp you can't see.
A clear, developer-ready report with photos and locations for every defect.
Handover experience with Emaar, Damac, Nakheel, Sobha and more.
See What 400+ Inspection Points Catch
Once you accept the property, you accept the defects. Book your inspection before you sign, and get your report in 24 hours.
From booking to a developer-ready report in four simple steps.
Tell us your property type, address and preferred date. We confirm within 2 hours.
A certified engineer arrives on time with thermal, moisture and electrical testing tools.
Structure, electrical, plumbing, AC and finishes checked room by room against our checklist.
A PDF report with photos, defect locations and developer-ready wording.
How to read a snagging reportDubai hands over thousands of new homes every year, and fast delivery often leaves finishing problems behind. A snagging inspection is an independent check of your property before you accept it, so every defect is recorded while it is still the developer's responsibility. New to the topic? Start with our guide to what property snagging is.
Book one to two weeks before your handover appointment, as soon as the developer sends the handover notice. This gives the developer time to fix the listed defects before you sign.
If you have already moved in, book a DLP inspection before your defect liability period ends, so anything that has appeared since handover is still covered.
Under UAE and Dubai rules, developers are generally responsible for fixing defects for a set time after handover. A snagging report with dated photos is your evidence if you need to raise a claim. Read more about your RERA handover rights in Dubai.
You receive a room-by-room report with photos, locations and repair notes within 24 hours. You share it with the developer's handover team, who fix the items on the list.
Before you accept the keys, a re-inspection confirms every item has been closed properly. See how this works in our guide to snagging vs de-snagging in Dubai.
The goal is to make the developer deliver what you paid for. Defects found before handover are theirs to fix.
There is usually no developer warranty left, so the report helps you negotiate the price or ask for repairs before transfer.
Taking handover from Emaar, Damac, Nakheel or Sobha? Our engineers know the defects each developer's properties commonly have.




Snagging in another community? See all the areas we cover
Our engineers carrying out on-site checks across Dubai, from paving and drainage to walls, tiles and gardens.
Reviews from buyers and investors across Dubai and Abu Dhabi, posted on Google.
Dubshy caught 89 defects the developer had signed off on. Report was thorough and the engineer explained everything clearly on site.
Booked for my handover in Dubai Hills. Engineer arrived on time, found faults in the AC and plumbing the developer's own team had missed.
Living in Palm Jumeirah, we had 95 defects reported, all fixed within 100 days at no cost to us. Highly professional team.
Used Dubshy for my JVC apartment. Report delivered same evening, professional communication throughout the process.
Below-market rate for a full villa inspection. Report has clear photos and priority tags for each defect found.
Purchased a resale villa in Abu Dhabi and had Dubshy inspect before signing. Professional, quality report, worth every dirham.
Dubshy is a RERA-approved and InterNACHI-certified snagging company, operating under Government of Dubai, Dubai Land Department and Abu Dhabi City Municipality regulations.





Local engineers in every major community. Choose your area to see what we check there.
Buying in the capital? Read our property snagging guide for Abu Dhabi
Quick answers to what Dubai buyers ask us most about snagging inspections, costs and handover.
Message our team and get an answer within working hours.
A room-by-room check of 400+ points: walls, ceilings, floors, doors, windows, electrical, plumbing, AC, kitchens, bathrooms, balconies and external areas. Every defect is photographed and located in your report. Read our full guide to what property snagging is.
Inspections start from AED 499 for a studio or 1-bedroom apartment. Larger apartments, villas and commercial properties are priced by size. See our property snagging cost guide for the full breakdown.
Book 1–2 weeks before your handover appointment, as soon as the developer sends the handover notice. If you have already moved in, book a DLP inspection before your defect liability period ends.
About 2–3 hours on site for most apartments and 4–6 hours for villas and townhouses, depending on size and condition.
Within 24 hours of the inspection, as a PDF with photos, defect locations and developer-ready wording. Here is how to read a snagging report.
If the defects are recorded before handover or during the Defect Liability Period, the developer is responsible for fixing them at no cost to you.
Send the report to the developer in writing and keep dated records of every follow-up. If items stay open, you can escalate through the RERA snagging complaint process.
Yes. A de-snagging visit confirms every item on the list has been fixed properly before you accept handover. Learn the difference between snagging and de-snagging.
Yes. A pre-purchase inspection shows the real condition of a resale home, so you can negotiate the price or ask the seller for repairs before transfer.
All of Dubai and Abu Dhabi, including Downtown, Dubai Marina, Business Bay, Palm Jumeirah, Dubai Hills and JVC. See all the areas we cover.
Every fault we miss, you pay for later
Book a certified snagging inspection today and get a developer-ready photo report within 24 hours.