A verbal complaint or a photo on your phone creates no legal obligation. Under Dubai's DLP framework, only a written, timestamped, developer-acknowledged snagging report does. That's exactly what we deliver — in 24 hours.
15,000+
Inspections Completed
1 Yr
Check Interval
24–48h
Report Delivery
4.9 ★
Google Rating
A snagging report is a professional document, written after careful examination, that reveals construction, finishing, and functionality defects — but its real power is legal, not just descriptive.
Under Dubai’s Defect Liability Period, developers must repair non-structural defects reported in writing within 12 months of handover, at no cost to the buyer. Structural defects affecting stability carry developer and contractor liability for up to 10 years. Critically: a defect reported verbally, or after the DLP has elapsed, carries no developer obligation — only a documented, timestamped, acknowledged report does.
If a developer acknowledges your report but doesn’t act, RERA guidance points to escalation via a formal written reminder, then the Dubai Land Department if they remain unresponsive — but only if your original report is properly documented.
Secures the buyer’s interests within a short time after handover, giving written records of defects the developer remains obligated to fix.
A basic snag list is brief buyer notes. A professional report includes technical notes, images, and explanations developers can act on directly.
Only a documented, timestamped, and acknowledged report creates an enforceable obligation under Dubai’s DLP framework.
We review property type, size, and handover schedule to plan the inspection efficiently.
Walls, ceilings, floors, doors, windows, and plumbing systems investigated thoroughly.
Sockets, switches, cooling systems, and safety-related elements assessed for hazards.
Every defect documented with descriptions and photos, delivered in a formal, developer-ready format.
Every finding is photo-documented, severity-rated, and timestamped — built to be submitted, acknowledged, and enforced under your DLP window.
Download a Sample ReportThe developer tried to dismiss a verbal complaint we'd made earlier — but the formal report we submitted forced them to act within their own RERA response window.
Booked with only weeks left in our DLP window. Report was back within 24 hours, which gave us just enough time to submit before it closed.
212 issues found and documented with photos — the developer fixed every one without a single argument. The report format made it impossible to dispute.
The developer tried to dismiss a verbal complaint we'd made earlier — but the formal report we submitted forced them to act within their own RERA response window.
Booked with only weeks left in our DLP window. Report was back within 24 hours, which gave us just enough time to submit before it closed.
212 issues found and documented with photos — the developer fixed every one without a single argument. The report format made it impossible to dispute.
A snagging checklist is a detailed list of potential defects and finishing issues in a property that are inspected during a snagging inspection. It helps ensure that all areas of the property are systematically reviewed.
The time required depends on the property size and complexity. Most inspections are completed within a few hours, with the report delivered digitally shortly after.
The cost of a snagging report varies based on the property type and size. Contact us for a personalized quote based on your property requirements.
While developers are contractually obliged to address defects, presenting a professional snagging report ensures clarity and increases the likelihood that all issues are resolved promptly.
It is recommended to schedule the inspection before official handover, before final payment, or before the expiry of the defect liability period to ensure timely rectification.