A proper snag list template needs five things for every single entry: exact location, a clear description, a photo, a severity rating, and a status. Skip any of these and you end up with exactly what most buyers hand developers, a vague note that generates follow-up questions instead of a fix. The table below breaks down what each field should actually contain.
The Five Fields Every Entry Needs
| Field | What to Include | Why It Matters |
| Location | Room, wall, fixture, exact corner (not just “bathroom”) | Removes any guesswork for whoever has to fix it |
| Description | Plain-language, specific detail (e.g. size and direction of a crack) | Tells the maintenance team exactly what they’re looking for |
| Photo | Close-up plus a wider shot showing context in the room | A photo of just the defect with nothing else in frame is nearly useless |
| Severity | Cosmetic, functional, or urgent/safety | Not every item deserves the same priority or response time |
| Status | Open, in progress, resolved | Creates a paper trail if anything drags on or needs escalating |
Why the Format Actually Matters
A snag list isn’t just a record for you, it’s a working document someone else has to act on without needing to ask follow-up questions. If a developer’s maintenance team can’t figure out exactly where an issue is from reading your list, they either guess, which sometimes means checking the wrong spot, or they come back to you for clarification, which adds days to a process that’s already slow enough.
Someone sent us a snag list last month that was literally a numbered note on their phone: “1. Bathroom tile cracked. 2. Kitchen tap loose. 3. Bedroom door sticks.” Three lines, no photos, no location beyond the room name. The developer’s team came back asking which bathroom, since the apartment had two, and which corner of which door was sticking. That back-and-forth alone cost him a week.
How to Structure the Full List
- Break it down by room, then by item within each room
- Number every entry so it’s easy to reference in follow-up conversations
- Keep a running status column so open items don’t get lost
- Note roughly when each defect was first noticed, versus your handover date
That last point is easy to skip but genuinely useful. If a crack shows up eight months in rather than on day one, that timing matters for whether it’s still a construction fault or general wear, and developers will sometimes push back on defects reported without any sense of when they actually appeared.
Where This Connects to a Full Snagging Report
A snag list, even a well-formatted one, is really just one piece of a full professional snagging report. The report adds the systematic check across every part of the property, electrical, plumbing, structural, alongside the location-by-location list, which is why booking an inspection tends to catch far more than filling out a template yourself.
If you’re doing your own walkthrough first, or want something to hand your inspector to cross-check against, a structured template covering the areas a civil inspection services in Dubai check would also look at, walls, ceilings, floors, structural joints, is a solid starting point.
What It Costs to Get This Done Properly
If you’d rather skip building your own template and have someone document everything to this standard from the start, our snagging report cost breakdown covers what that actually costs depending on unit size and property type.
FAQ’s About Snag List Template
Do developers actually require a specific format for snag lists?
Most don’t mandate one formally, but the clearer and more structured yours is, the faster it tends to get actioned. A messy list often just gets deprioritised behind clearer ones from other buyers.
How many photos should each entry have?
At minimum one close-up and one wider shot showing where the issue sits in the room. For anything structural or safety-related, more angles help avoid any back-and-forth about exactly what was found.
Can I use a spreadsheet instead of a formal report?
You can, and it’s better than nothing, but it won’t carry the same weight with a developer as a report produced through an independent professional inspection, even if the underlying content is similar.
Does Dubshy provide the report in a format I can send straight to my developer?
Yes. Dubshy delivers reports already structured the way developers expect to receive them, so there’s nothing left for you to reformat before sending it over.
Don’t Let a Vague List Slow You Down
| Get a report your developer can act on immediately A snag list that actually gets acted on quickly is one that leaves nothing for the developer to guess at, exact location, clear description, a photo, a severity level, and a status. If you’d rather have that done properly from the start, you can request your snagging report and skip the back-and-forth entirely. |