... Skip to main content

Dubshy Property Snagging

Image: FeaturedRatio: 16:9 (1200 x 675)Situation: Engineer kneeling beside a private villa pool edge, checking the coping tiles, villa terrace behindTitle: Damac Lagoons SnaggingAlt text: Engineer checking pool coping tiles at a new villa before handover
Engineer checking pool coping tiles at a new villa before handover

Damac Lagoons Snagging: Villa Checklist Before Keys

Community checklist3 min read

Damac Lagoons snagging should happen before you collect the keys, while the developer can still fix what you find. Four areas deserve the most time in a villa: tiles, AC, the pool (if you have one) and drainage. Use the checklist below on your walk-through, then have an engineer confirm anything you are unsure about.

This checklist from Dubshy's experts focuses on four areas. For the community overview, see our page on snagging in Damac Hills.

Why Start Damac Lagoons Snagging Before the Keys?

Before you sign, every defect you record goes onto the handover list for the developer to fix. After you move in, it can be harder to show that a scratch, crack or leak was there from the start. Inspect with power, water and AC running, and the pool filled if you have one.

The Damac Lagoons Villa Checklist

1. TilesFloors and walls
Where
Living areas, bathrooms, terraces, pool deck
How to check
Tap tiles at the centre and corners and listen for a dull, hollow sound; look for cracks, chips and raised edges
2. ACSystems
Where
Every room and every unit
How to check
Run each unit; every room should cool; listen for rattles and check grilles are fitted straight
Image: Internal 1 (after the AC check)Ratio: 16:9 (1200 x 675)Situation: Engineer holding a thermometer near a ceiling AC grille in a villa bedroomTitle: Villa AC Grille CheckAlt text: Engineer checking AC airflow at a ceiling grille in a new villa
Engineer checking AC airflow at a ceiling grille in a new villa
Check that every room cools, not just that the unit turns on.
3. PoolIf fitted
Where
Pool shell, coping, deck and pump room
How to check
Look for cracked or loose tiles and coping; check the pump room for leaks or standing water; ask for the pool to be filled and running
4. DrainageOutside and wet areas
Where
Terraces, garden, showers and balconies
How to check
Pour water near each drain; it should flow away, not pool or run back towards the house
Image: Internal 2 (after the drainage check)Ratio: 16:9 (1200 x 675)Situation: Bucket of water being poured on a villa terrace, water running towards a floor drainTitle: Villa Terrace Drain Water TestAlt text: Water test on a villa terrace drain before handover
Water test on a villa terrace drain before handover
Water should run straight to the drain and clear quickly.

Want an engineer to run the full checklist?

book an inspection

What Should You Do After the Walk-Through?

  1. Photograph everythingOne wide shot and one close-up for each item.
  2. Submit in writingSend the list through the developer's official handover channel.
  3. Re-checkConfirm each repair before you accept the keys.

For pool-specific checks, see our guide to pool inspections, and for the developer background, read about Damac build quality.

Where an inspection stops

An inspection covers your villa on one day. It does not open walls or buried pipes. Whether an item must be repaired depends on your sale agreement. For official information on property in Dubai, see the Dubai Land Department.

FAQs

When should I inspect my Damac Lagoons villa?

Inspect after the handover notice arrives and before you collect the keys and sign. Make sure power, water and AC are on, and the pool is filled if you have one. That way every system can be tested, and the developer can fix the listed items before you move in.

Can I check the tiles myself?

Yes. Tap each tile at the centre and corners with a coin and listen for a dull, hollow sound, then mark and photograph any that sound different. Also look for cracks, chips and raised edges. An inspector covers every floor, wall and outdoor tile systematically if you want a full record.

What if the pool is not filled on the inspection day?

Ask the developer to fill it and run the equipment before the inspection, or book a separate visit once it is running. Without water, leaks, pump problems and some tile issues cannot be seen. Note it in writing so the pool check is not missed before you accept the villa.

Collecting Keys in Damac Lagoons?

Share your handover date and villa type, and we will plan the inspection before you accept it. Fees are quoted after a short scope call, with all costs listed upfront.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.