You’ve done the walkthrough, signed off on the paint and the tiling, and everything looks sharp. Then a month in, a door starts sticking in the heat, or you notice a draft around a window frame that definitely wasn’t there during handover. Window and door defects are some of the most common — and most overlooked — issues in new Dubai apartments, partly because many of them don’t show up until the building has gone through a full temperature cycle.
Dubai’s climate puts real stress on window and door installations. Frames expand and contract with heat, seals dry out faster under constant sun exposure, and rushed installation during handover crunches often means alignment gets checked once and never revisited. A proper windows and doors inspection catches these issues at the point they’re still the developer’s responsibility to fix, rather than months later when you’re footing the bill yourself.
One of the first to fail in UAE heat is the rubber and silicone gasketing around window frames. One of the first places that become compromised in the UAE heat is the rubber and silicone gasketing around window frames. Even if there is no visible damage to the seal, a seal that appears intact but is no longer flexible will not perform its function of excluding dust or moisture.
If the window isn’t perfectly square in its frame, the gaps will show up, and latching the window will be cumbersome, or it will whistle on windy days. This is normally an installation problem and not a manufacturing problem, and that is why it is imperative that it be identified prior to handover sign-off.
For double glazing, if you do not see condensation on the outside of the unit but rather between the panes, it means that the seal on the glazing unit itself has failed. This is one that can appear and disappear with changes in temperature and will only be visible under specific conditions.
Sticking doors, particularly internal doors, may indicate that the frame has slightly moved or that the door has been hung out of level. This is a minor issue now but will get worse as the building settles more.
In hurried construction, there are common problems such as stiff handles, locks that don’t match their strike plates, or hinges that don’t align with their strike plates. It is important to test each door several times, as it can stick intermittently and not be noticed the first time.
Balcony and entrance doors facing direct sun or exposed positions deal with more expansion and contraction than internal doors. Weather seals here wear out faster, and gaps at the threshold let dust in even when the door looks like it’s closing properly.
Factor | Windows | Doors |
Most common defect | Seal degradation, misalignment | Sticking, hardware misalignment |
When it becomes noticeable | Often after first heat cycle | Often within weeks of handover |
Harder to spot on first look | Condensation between panes | Weatherproofing gaps at threshold |
Worth extra attention | South/west-facing units | Balcony and entrance doors |
Window and door inspections are typically bundled into a full apartment snagging inspection rather than priced separately, with full inspections starting from AED 499 depending on unit size. Dubshy scales pricing to the number of windows, doors, and balcony openings in the unit.
Only testing doors and windows once: A door can close fine on the first try and still drag intermittently — worth testing several times under slightly different conditions.
Skipping the balcony door because it “looks new”: Weatherproofing issues on exposed doors often aren’t visible until the seal has gone through a full heat cycle.
Assuming a stiff lock will loosen up on its own: Hardware misalignment tends to get worse, not better, especially if it’s tied to a shifted frame rather than just new hardware settling in.
Not documenting minor issues at handover: A hairline gap or slightly stiff handle might seem too small to mention, but it’s worth having on record as a baseline in case it worsens later.
Book now — certified inspection, DEWA-ready report in 24 hours.
Many issues only become obvious after the building has gone through a full heat cycle, since seals and frame alignment shift with temperature that a single walkthrough won't capture.
Generally yes, if they relate to installation or material defects rather than normal wear, though it's worth having a dated inspection report to support the claim.
You can spot obvious gaps and stiff hardware, but seal degradation and condensation between glazing panes are much easier to catch with thermal imaging than a visual check alone.
Yes — they face more sun and weather exposure, so checking weatherproofing from both the inside and outside matters more than it does for internal doors.
Yes. Dubshy checks every window and door as standard, including function testing, seal condition, and thermal imaging where relevant.
Small gaps and sticking hardware are easy to dismiss at handover, but they’re also some of the cheapest issues to get fixed while the developer is still responsible for them. Book a windows and doors inspection before you sign off, and get a dated report covering exactly what’s easy to miss on a walkthrough.