DED Licensed
InterNACHI Certified
RERA Approved
A fire-rated board installed the wrong way isn't a fire-rated wall. We verify plastering and drywall partitions against Dubai Civil Defence fire ratings and moisture-resistance requirements — not just how they look.
15,000+
Inspections Completed
1 Yr
Check Interval
24–48h
Report Delivery
4.9 ★
Google Rating
Hidden defects behind a smooth-looking wall can lead to cracks, mould, poor fixings, and — in commercial buildings — a wall that fails its fire rating despite using the right board.
Dubai Civil Defence requires partition walls to meet specific fire-resistance ratings — typically 60 minutes for standard separating walls, and 90–120 minutes for stairwells, lift lobbies, and plant rooms. Critically, the rating applies to the entire tested assembly — board type, stud gauge, fixing pattern, and joint sealing together — not the board alone.
In wet areas, moisture-resistant (green-faced) board is required given Dubai’s 90%+ coastal humidity. Using standard board here leads to swelling, joint failure, and mould — even when everything looks fine on the surface.
Straightness and flatness checked to prevent cracks, uneven finishes, and long-term surface issues.
Smoothness, texture, and finishing quality assessed and documented for timely correction.
Weak joints and poor fixing points identified before they become costly repairs.
Correct application checked for strength, durability, and long-lasting performance.
Panel fixing, joint alignment, and secure installation checked to prevent sagging or warping.
Damage, water ingress, and insulation gaps checked to prevent mould and energy loss.
Walls, ceilings, and finishes checked for alignment, smoothness, and structural integrity, with all findings recorded.
Partition assemblies checked against Dubai Civil Defence fire ratings and moisture-resistance requirements for the room type.
Photo evidence of every defect, with clear, professional recommendations you can act on immediately.
Protect your investment by catching hidden defects before they escalate.
Evaluate true finishing quality before committing capital to a property.
Verify workmanship and compliance before authority sign-off.
Document existing condition and flag issues before you take possession.
Confirm new partition and finish work meets fire and quality standards.
Concealed cracks, poor adhesion, and moisture damage caught before they get out of control.
Checked against Civil Defence fire ratings and Dubai Municipality construction standards.
Photo evidence and specific recommendations, not vague observations.
Zero commercial ties to any contractor — our results have no conflict of interest.
Preserves finish quality and durability, avoiding costly structural repairs later.
A detailed, actionable report you and other stakeholders can rely on with confidence.
Great communication throughout. They inspected our tower's facade cladding and delivered the compliance report ahead of schedule.
Booked them for a pre-purchase facade survey on an apartment in Marina. Clear report, fair price, and quick turnaround.
Excellent service from start to finish. They caught cracking in the parapet wall the contractor had missed completely.
Professional, punctual, and thorough. The report gave us exactly the leverage we needed with the developer.
Great communication throughout. They inspected our tower's facade cladding and delivered the compliance report ahead of schedule.
Booked them for a pre-purchase facade survey on an apartment in Marina. Clear report, fair price, and quick turnaround.
Excellent service from start to finish. They caught cracking in the parapet wall the contractor had missed completely.
Professional, punctual, and thorough. The report gave us exactly the leverage we needed with the developer.
A professional check of walls, ceilings, and drywall finishes. It verifies proper installation, alignment, and quality — including fire-rating and moisture-resistance compliance — while identifying issues like cracks, poor adhesion, and moisture problems early.
Dubai Civil Defence mandates specific fire ratings for partition walls, and coastal humidity above 90% makes moisture-resistant board essential in wet areas. Poor plastering and drylining is one of the most frequent post-handover complaints in the city.
Property owners, landlords, investors, developers, contractors, and tenants preparing for handover — especially before final payment, handover, or renovation sign-off.
Most apartments take 1–2 hours; larger villas or commercial fit-outs with multiple partition types can take longer.
A detailed report with photo evidence of every defect, severity ratings, and clear, professional recommendations for correction.